Testimonials
At the start I really didn’t think this job (Nanaimo Train Station) was doable. I was completely wrong. Tectonica showed us it was possible to rebuild a severely fire-damaged heritage building and meet the requirements of the Heritage Act. It was an absolutely masterful job.
Do you have a project you’d like to discuss with us?
We’d love to meet with you and determine if Tectonica is a great fit for your next project.